Dubai is building the world’s largest airport in its south, next to the Expo 2020 site that is becoming a new city. This article sets out what is being built, when each piece arrives, and why the corridor from Dubai South towards Palm Jebel Ali is drawing so much attention.
The short answer
- A new airport terminal. A reported AED 128 billion terminal at Al Maktoum International Airport (DWC) will handle 150 million passengers a year in its first phase, due in 2032, and 260 million at full build-out.
- A new city beside it. Expo City Dubai is planned as a 3.5 sq km district for more than 35,000 residents and 40,000 professionals.
- A metro link. An AED 2 billion extension from Route 2020 to the airport’s West Terminal is scheduled for 2031.
- Buyers are already moving. Dubai South recorded 12,428 home sales in the first eight months of 2026, 27% more than in all of 2025.
The airport
Dubai Airports has awarded AED 13 billion in contracts for the new terminal this year and plans to award another AED 55 billion by the end of 2026. The work is well under way: 17,000 piles are in the ground, 45 million cubic metres of earth have been moved, and about 9,000 workers are on site, rising to 120,000 at the peak.
At full build-out the airport is planned to handle 260 million passengers and 12 million tonnes of cargo a year. Dubai International is expected to reach its maximum capacity by 2032, and Al Maktoum is the next step. With long-range narrow-body aircraft such as the Airbus A321XLR, it could serve as many as 600 cities directly by the time it opens.
Expo City: a new district beside the airport
Expo City Dubai is the former Expo 2020 site, beside the airport. Its master plan, unveiled in October 2024, covers 3.5 sq km in five districts: Expo Hills, Expo Fields, Expo Business, Expo Downtown and Expo Forest. It is planned for more than 35,000 residents and 40,000 professionals, and is often described as the UAE’s first 15-minute city.
Homes are already arriving. Expo Valley will have more than 500 townhouses and villas set in a nature reserve, and three residential projects are due for handover in 2026. DP World is moving its global headquarters to the district, which links it to Al Maktoum Airport and the logistics corridor around it.
Getting there: the metro link
An AED 2 billion metro extension will run 3 km from Route 2020 to the airport’s West Terminal, with two new stations. Services are scheduled to begin in 2031, according to the Dubai Government Media Office, and the line will connect with the airport express line and Etihad Rail’s high-speed network.
The market is already responding
Buyers have not waited. In January to August 2026, Dubai South recorded 12,428 residential sales worth AED 15.9 billion, against 9,788 in all of 2025. According to Anarock, the average price has risen from AED 650 per sq ft in 2020 to AED 1,656, and the average annual rent from AED 34,534 to AED 82,063.
What it means for a buyer
- Jobs bring residents. An airport, a logistics hub and corporate headquarters create jobs, and the people who fill them need homes close by. That is the demand the south is being built for.
- A choice of homes along the corridor. Palm Springs by Nakheel offers townhouses and villas about 23 minutes from Al Maktoum Airport, 14 minutes from Palm Jebel Ali and 25 minutes from Palm Jumeirah, from AED 3.8 million, with handover planned for October 2030.
- Time works with the milestones. The metro link is scheduled for 2031 and the airport’s first phase for 2032, so a purchase made today has years to mature alongside them. Start with our guide to escrow, Oqood and RERA to see how an off-plan purchase is protected.
Sources
- The National: Dubai to award Dh55bn in contracts by year-end for Al Maktoum Airport expansion (26 August 2026)
- Khaleej Times: Dh128b Al Maktoum International Airport project fuels real estate boom in Dubai South
- Khaleej Times: Dubai South home sales surpass full-year 2025 by 27% (Anarock)
- Business Today: Dubai South property boom, 27 October 2026 (Anarock data)
- The National: new master plan for Expo City Dubai (3 October 2024)
- Gulf News: Dubai South homes, DWC Metro link adds a new edge for buyers and tenants
This article is general information, not financial or investment advice. Figures come from the sources below and are rounded; dates are as announced and may change.